久久夜色精品国产网站,久久久99精品免费观看,亚洲日韩AV无码一区二区三区人,西西人体WWW大胆高清,无码精品人妻一区二区三区漫画,日韩精品无码人妻一区二区三区,国产乱子伦视频一区二区三区,亚洲成AV人综合在线观看,国内精品久久久久国产盗摄,又大又粗又爽又黄的少妇毛片

<strike id="s6sgm"><input id="s6sgm"></input></strike>
  • <del id="s6sgm"><sup id="s6sgm"></sup></del>
    <ul id="s6sgm"><center id="s6sgm"></center></ul>
  • <strike id="s6sgm"><input id="s6sgm"></input></strike>

    Shandong Zhongrui Construction Machinery Co., Ltd official website!

    National Service Hotline:
    15005366588
           CONTACT US
    Shandong zhongrui construction machinery co. LTD
    Address : 3701 Zhuangjian Road, Kuiwen Economic Development Zone, Weifang City, Shandong Province, China
    Zip code:261041
    Phone:86-536-2288189 
    Manager li:15005366588
    URL:www.xiekoo.com
    Email:15005366588@163.com 
    News Center

    YT28 Rock Drill Series: (faults and troubleshooting methods)

    If you encounter problems when using the YT28 air-leg rock drill, please try to solve it according to the methods provided below.  
     

    Fault category Reason How to eliminate
    Drilling speed decreased Working air pressure is too low 1. Check the air supply system of the air compressor and ensure the output pressure .
    2. Appropriately reduce the number of rock drills working at the same time, or reduce other gas-consuming operations.
    3. Check if there is any leakage in the pipeline, and deal with it.
    4. Shorten the length of the gas pipeline (the length of the gas pipe should be controlled within 15 meters), and replace the gas pipe and valve switch whose aperture does not meet the requirements.
    Poor lubrication Inject oil according to regulations, and ensure that the oil path of the oil injector is unobstructed. It is strictly forbidden to work without lubrication or use grease lubrication
    Incorrect shank size The length of the shank should be 108±1mm, and it should be corrected if it is too long or too short.
    Part failure Replace failed parts in time.
    The waterway is not clear, water is leaking from the end of the machine head or water is poured into the machine 1. Replace the broken water needle in time.  
    2. The center hole of the drill rod is blocked or too small, and the drill rod should be replaced.
    3. The diameter of the water needle does not meet the specifications (generally not less than 3 mm), the water needle should be replaced.
    4. The water pressure is higher than the air pressure, causing high-pressure water to flow back into the machine and destroy the normal lubrication of the machine. At this time, the water pressure must be lowered.
    Insufficient thrust of the air leg or poor expansion and contraction 1. The rubber wrist of the air leg is worn or loose, and it must be replaced or reassembled in time.
    2. The frame body and the outer tube are loose, causing the upper and lower chambers to blow through. The frame body must be tightened.
    3. The seal is damaged or lost and should be replaced.
    4. The expansion ring of the pressure regulating valve is worn out and cannot be accurately positioned and should be replaced.
    5. The reversing valve is worn or the reversing valve snap ring (YT24-3.01) is missing, which causes the reversing valve to be shifted. Parts should be replaced and supplemented.
    6. The trigger is worn, the stroke is not enough when the reversing valve is compressed, and the air leg is not easy to retract. The trigger should be replaced.
    Excessive machine vibration 1. The air leg and the ground support angle is too large or the thrust is insufficient, resulting in a large recoil force of the machine, the angle should be changed to increase the thrust.
    2. The shank bushing is worn too much, causing the machine to swing, and the shank bushing should be replaced.
    3. The bending of the drill rod causes unstable operation, and the straight drill rod should be replaced.
    Broken water needle Seriously piled up at the small end of the piston Replace the piston
    Large matching clearance between the shank and the shank When the size of the hexagonal opposite sides in the shank sleeve is severely worn, it must be replaced in time
    The center hole of the shank is not correct or does not meet the size requirements The shank should be trimmed as required
    Failure of air-water linkage The water pressure is too high Take measures to reduce the pressure.
    Air and water paths are blocked Inspect and remove blockages in gas, water pipes, filling valve bodies, and waterways.
    Fatigue failure of water injection valve spring Replace the spring
    The air barrier and water aprons are ineffective Check and replace the seals
    Corrosion Clean and remove rust
    99久久免费国产精品| 一区二区三区国产亚洲网站| 乱码午夜-极品国产内射| 色婷婷综合久久久中文字幕| 免费a级毛片无码免费视频| 无码成a毛片免费| 国产精品午夜无码体验区| 亚洲中文字幕av每天更新| 亚洲gv白嫩小受在线观看| 未满十八18禁止免费无码网站| japanese丰满少妇最高潮| 亚洲精品中文字幕乱码三区| 国产交换配乱婬视频| 欧美日韩国产一区二区三区不卡| 在线亚洲精品国产二区图片欧美| 国产伦精品一区二区三区| 无码高潮少妇毛多水多水| 国产精品乱码在线观看| 亚洲av成人中文无码专区| 久久久久久久97| 小婷又软又嫩又紧水又多的视频 | videos日本多毛hd护士| 一二三四在线观看免费高清视频 | 亚洲av一宅男色影视| 亚洲va在线va天堂va不卡| 国产超碰人人做人人爱ⅴa| 全黄h全肉边做边吃奶视频| 华人黄网站大全| 无码丰满熟妇| 色综合久久久无码中文字幕波多| 永久免费a∨片在线观看| 国产精品va在线播放我和闺蜜| 97人人模人人爽人人少妇| 国产不卡一区二区三区免费视频| 亚洲avav天堂av在线不卡| 久久精品久噜噜噜久久| 亚洲中文精品久久久久久| 2018天天躁夜夜躁狠狠躁| 国产精品天干天干在线综合| 久久综合激激的五月天 | 日本伦理电影在线观看|